Plan for Utilization Rate (U.R.) and Management Rate (M.R.) of Industrial Solid Waste in Beijing (1995~2015)

Waste

Year

Classifications

1995

2000

2005

2010

2015

กก

M.R.

U.R.

M.R.

U.R.

M.R.

U.R.

M.R.

U.R.

M.R.

U.R.

blast furnace slag

0.97

0.03

0.97

0.03

0.98

0.02

0.99

0.01

0.99

0.01

coal gangue

0.19

0.00

0.30

0.00

0.35

0.65

0.37

0.63

0.40

0.60

coal ash

0.66

0.34

0.75

0.25

0.80

0.20

0.85

0.15

0.95

0.05

cinder

0.77

0.07

0.83

0.17

0.87

0.13

0.90

0.10

0.95

0.05

tailings

0.15

0.52

0.25

0.68

0.30

0.70

0.40

0.60

0.40

0.60

water processing sludge

0.96

0.04

0.96

0.04

0.96

0.04

0.97

0.03

0.98

0.02

industrial dust

0.94

0.06

0.95

0.05

0.96

0.04

0.97

0.03

0.98

0.02

total

0.70

0.17

0.75

0.18

0.78

0.22

0.82

0.18

0.85

0.15

กก